Project Description:

Building 5N is the new home for the Workforce programs, including Dental Assisting, Dental Hygiene, Nursing and Cosmetology, as well as the new home for Wellness and Aquatics. This location, at the south end of the campus near the campus entries, is convenient for the community members who are patrons of these programs. These programs will thrive and grow in this new building, with state of the art equipment and adjacencies to each other that will foster interactions and synergy. The Aquatic Center is comprised of an Olympic-sized pool and a second pool for competition warm-ups as well as Adaptive Physical Education. This combination of Workforce and Wellness brings new energy to the southern end of the CSM campus. This new building is LEED Gold certified (Leadership in Energy and Environmental Design), demonstrating CSM’s commitment to sustainable building design and construction.

In an effort to attain the LEED Gold certification for green design the demolished building concrete was crushed on site and reused as sub-grade for road and parking upgrades instead of hauling the demolished material off to a landfill and bringing new material on site at a cost to both the college and the environment. Steel reinforcement in the concrete was salvaged during the crushing process and recycled as well as any other steel or recyclable metals in the building.

The project uses “Cool Roof” technology to reflect as much heat as possible back into the atmosphere to decrease the heat load of the building thus less energy will be needed to cool the building. This technology uses an almost white color for the roof and is made of a material that is conducive to heat loss.

Schedule
  • Opened 4/1/2010
Status:

Complete

Design-Build Project Manager: Barry Chin, Design Manager
Telephone: 650-358-6787
E-Mail chinb@smccd.edu
Project Manager: Karen Pinkham
Telephone: 650-358-6714
E-Mail pinkhamk@smccd.edu
Project Coordinator: Jennifer James
Telephone: 650-358-6733
E-Mail jamesj@smccd.edu
Bridging Architect: Steinberg Architects
Architect: Kwan Henmi Architecture/Planning
Design Build Contractor: McCarthy Building Companies, Inc.
Funding
Source(s):
Measure A general obligation bond funds

Project Documents

Watch a time lapse video of the pools being filled here (New Window)

Watch a time lapse video of the building being constructed here (New Window)

Facilities Planning & Operations
Phone: (650) 574-6512
Fax: (650) 574-6574

San Mateo County Community College District
3401 CSM Drive
San Mateo CA 94402

spacer   
   
spacer
spacer

Copyright 2011 © San Mateo County Community College District. All rights reserved.
Questions? Contact the Webmaster