North Gateway Project College of San Mateo: Part I; Load Center #8 and Site-wall
Replace this with Building Photo
Photos
Project Description:

Decommissioning of Electrical Load Center #4, installation of new Electrical Load Center #8, relocation of existing Building 18 transformer and switch-gear, installation concrete site-wall, landscaping and tree removal and pruning.

Project Benefits:

Phase I of the North Gateway Project will enhance safety by decommissioning Load Center #4 which has experienced water intrusion. The project will provide safe, dependable and efficient electrical service to the North end of the CSM campus. Tree removal and pruning will alleviate urban/wildfire interface by removing damaged, diseased and highly flammable non-native species. Removal of these aged and non-native species will allow Oaks and other native species to flourish.

Schedule
  • Construction commenced December 2010 and will complete by September 2011.
Status:

Complete

Project Manager: Karen Powell
Telephone: 650-378-7359
E-Mail powellk@smccd.edu
Project Coordinator: Pepper Powell
Telephone: 650-358-6811
E-Mail powellp@smccd.edu
General Contractor: Robert A. Bothman, Inc.
Funding Source(s): Funding Sources

Project Links:

Project Documents

Facilities Planning & Operations
Phone: (650) 574-6512
Fax: (650) 574-6574

San Mateo County Community College District
3401 CSM Drive
San Mateo CA 94402

spacer   
   
spacer
spacer

Copyright 2011 © San Mateo County Community College District. All rights reserved.
Questions? Contact the Webmaster