North Gateway Project College of San Mateo: Part II; Demolition of Buildings 21 – 29 & North Gateway Plaza
North Gateway Rendering
Project Description:

Demolition of existing buildings #21 – 29. Creation of new Gateway Plaza, renovation of existing parking lots 6 A-D. New Plaza and amphitheater, pedestrian pathways, landscaping and energy efficient LED parking lot lights.

Project Benefits:

The North Gateway Project will provide additional parking, enhanced safety and accessibility with improved pedestrian and vehicle paths and roadways.

Schedule
  • To be determined
Status:

On August 29, 2014, the District was forced to terminate Interstate Grading and Paving Inc.’s (IGP) right to proceed with contracted work for the College of San Mateo North Gateway Part 2 Project. IGP was over 4 months behind schedule, with a projected completion date that was over 6 months behind schedule. Significant portions of the work installed are defective and must be remediated. IGP provided the District with unacceptable assurances and did not present a coherent plan to complete the project timely, including remediation of defective work. The District worked diligently with IGP to achieve timely completion of the project in accordance with the contract documents. Unfortunately, IGP continually failed to meet its commitments to the District.

The District will work with IGP’s Performance Bond / Surety, who issued the required performance bond, to insure the project is completed timely and in accordance with contractual requirements for a quality, durable installation that will serve the community over decades to come. There is a process under the Performance Bond with which the District must comply that includes an approximate 30-40 calendar day period during which work may not proceed. We anticipate that within 30-40 days the District should receive input from IGP’s Performance Bond / Surety. That input should inform the District as to the next steps that will need to be taken with respect to the project, and should provide an opportunity to identify activities that need to be undertaken and a timeline for work to resume.

Thank you in advance for your patience as we work within the constraints of this process. We understand the impact of the project’s delay upon your daily activities and will continue to keep you apprised of developments. Other than limited activities to protect the work in place, we do not anticipate work to resume for several months.

Project Manager: TBD
Telephone:  
E-Mail

 

General Contractor: TBD
Funding Source(s): Measure A General Obligation Bond

Facilities Planning & Operations
Phone: (650) 574-6512
Fax: (650) 574-6574

San Mateo County Community College District
3401 CSM Drive
San Mateo CA 94402

spacer   
   
spacer
spacer

Copyright 2011 © San Mateo County Community College District. All rights reserved.
Questions? Contact the Webmaster