Hi everyone –  in order to finish up some electrical upgrade work, a Building 6 power shutdown is necessary.  We asked Hensel Phelps and Decker Electric to schedule the building power shut down so as to minimize any impacts to the campus . . . this Friday is a Holiday and was determined the best time to get this work done.

Buildings 6 will be without power on Friday, November 12, from 7 a.m. to 3 p.m.  (total planned outage = 8 hours). 

This means Buildings 6 will have no lights, no heat, no air circulation, no computers, no phones, and no power at electrical outlets during their periods of the power outage.

Our other buildings on main campus will not be affected by this power outage.

If you have questions or are in need of any support as you get ready for this power outage, you can contact the Skyline Swinerton Team Chief, Jack Herbert, at ext 7037, or herbertj@smccd.edu.

Sorry for the temporary inconvenience.   Take care  -

Richard
Richard Inokuchi
Facilities Operations Manager
Skyline College   3300 College Drive   San Bruno    94066
(o) 650-738-4166 (f) 650-738-4113 (c) 650-642-4974
inokuchir@smccd.edu
www.smccd.edu/accounts/smccd/departments/facilities/FPMOMain.shtml

Facilities Planning & Operations
Phone: (650) 574-6512
Fax: (650) 574-6574

San Mateo County Community College District
3401 CSM Drive
San Mateo CA 94402

spacer   
   
spacer
spacer

Copyright 2011 © San Mateo County Community College District. All rights reserved.