Hi everyone – the new outdoor stairway that connects Parking Lot E (Staff) with Lot F (Staff and Student) is going to get some painting done to improve safety.
On Friday, May 14 – we will be having Bothman Construction return and paint the stair treads. This means you will not be able to use that stairway to get between the two parking lots.
Question and comments should be directed to Jack Herbert (Swinerton) at ext 7037 or herbertj@smccd.edu.
I apologize for this temporary inconvenience and last minute notice. Thanks -