Planning & Construction: Capital Improvement Program
(CIP)
FACILITIES
PROJECTS LIST
On July 11,
2001 (Board Report No. 01-7-1C), the Board received a report containing
a review of facilities projects. The project list, as noted in the
July 11 report, resulted from several months of activities designed
to assure that the District's physical resources will meet a high
standard of instructional readiness. Included in these efforts were
the following: (1) an extensive Facility Audit; (2) a Comprehensive
Energy Analysis; and (3) a significant update of the Facility Master
Plan. In addition to identification of the major renovation, repair
and energy efficiency needs of the District, these activities highlighted
the District's need for property improvements and acquisitions to
meet educational program goals.
The facilities
project list was finalized to reflect conclusions reached during
the discussion at the Board meeting on July 11. That list is shown
below, organized as follows: (1) repair and renovation (including
energy efficiency projects), (2) technology and equipment, and (3)
proposed Facility Master Plan projects. The District seeks Board
approval of the list as a basis for General Obligation Bond projects.
The cost of the projects total $246 million, of which $207 million
would be funded through a General Obligation Bond and $39 million
would be funded through local and State sources, in addition to
interest revenue generated from the investment of Bond funds.
I.
REPAIR & RENOVATION $100
million ($90 million G.O.
Bond, $10 million State and local funding)
A. Repair
or replace roofing
B. Remove hazardous materials
C. Renovate or replace plumbing systems
D. Renovate or replace storm drainage systems
E. Repair or replace sanitary drainage systems
F. Repair, replace or renovate underground hot water piping system
G. Replace or upgrade fire alarm systems
H. Replace or upgrade building fire sprinkler systems
I. Renovate or upgrade restrooms
J. Repair, renovate or construct elevators and lifts
K. Install battery backup power for elevators
L. Grade slopes to improve accessibility
M. Repair or replace asphalt and concrete surfaces
N. Replace or install campus signage to improve accessibility
O. Interior and exterior painting and waterproofing
P. Replace, repair, or renovate interior finishes
Q. Repair or replace door hardware and locks
R. Replace or repair landscape irrigation systems
S. Erosion mitigation
T. Energy Efficiency:
- Replace
or upgrade electrical systems
- Replace
or install new lighting systems
- Repair,
replace or install new heating, ventilation and air conditioning
systems
- Repair
or upgrade windows
- Install
energy management systems
- Replace
or upgrade environmental controls
U. Resurface
tennis courts *
V. Resurface athletic fields *
W. Renovate aquatic facilities *
X. Renovate athletic facilities *
* Not currently
proposed for General Obligation Bond proceeds
II. TECHNOLOGY AND EQUIPMENT $40 million
(G.O. Bond)
A. Replace
obsolete voice and data communications systems
B. Renovate, upgrade or install infrastructure for networks
C. Upgrade or replace computer hardware, including network equipment
D. Replace or upgrade software
E. Replace analog systems with digital broadcast equipment and
related communications devices
F. Upgrade or replace science lab equipment (e.g., imaging astronomy
cameras, Planetarium star projector, measuring scales, seismograph
stations, weather instruments, optic systems and timers, microscopes)
G. Upgrade or replace workforce development, vocational, and occupational
lab equipment (e.g., aircraft scales, vacuum systems, fiber optic
kits, cutters/torches, motion graphics equipment and software,
X-ray systems, light curing units, patient beds, facial machines,
professional hair dryers, automotive lifts, and Law Enforcement,
Fire Safety and Emergency Medical Training units)
H. Upgrade or replace audio visual equipment
I. Upgrade or replace visual/performing arts equipment (e.g.,
pianos, keyboards, music stands, cameras, projectors, enlargers,
developers, audio sound machines, editing machines, recorders)
J. Replace or upgrade furniture and fixtures (e.g., desks, workstations,
chairs, tables, podiums, screens, lecterns, white boards, chalk
boards)
III.
MASTER PLAN PROJECTS $106 million ($77 million G.O. Bond, $29 million
State and local funding)
Cañada College
1. Library/Learning
Resource Center (State Capital Outlay and General Obligation Bond)
2. University Center (State Capital Outlay & General Obligation
Bond)
3. Student Support Services Extension (General Obligation Bond)
College
of San Mateo
1. Integrated
Science Center (State Capital Outlay and General Obligation Bond)
2. Vocational Technology & Communications Center (State Capital
Outlay and General
Obligation Bond)
3. Regional Public Safety Center (local public safety agencies
and General Obligation Bond)
4. Student Support Services Center (State Capital Outlay and General
Obligation Bond)
Skyline
College
1. Occupational
& Work Force Development Center (General Obligation Bond)
2. Student Support & Community Services Center (Student Union
Fee and General
Obligation Bond)
3. Childhood Development Center (State Capital Outlay)
4. Pacific Heights campus redevelopment (local funds and General
Obligation Bond)
5. Automotive Technology-Transmission Facility (General Obligation
Bond)
Districtwide
1. Temporary
classroom, lab, office, restroom, and storage facilities during
reconstruction
2. Other property acquisitions and improvements