              PROJECTS LIST  On July 11, 
              2001 (Board Report No. 01-7-1C), the Board received a report containing 
              a review of facilities projects. The project list, as noted in the 
              July 11 report, resulted from several months of activities designed 
              to assure that the District's physical resources will meet a high 
              standard of instructional readiness. Included in these efforts were 
              the following: (1) an extensive Facility Audit; (2) a Comprehensive 
              Energy Analysis; and (3) a significant update of the Facility Master 
              Plan. In addition to identification of the major renovation, repair 
              and energy efficiency needs of the District, these activities highlighted 
              the District's need for property improvements and acquisitions to 
              meet educational program goals. The facilities 
              project list was finalized to reflect conclusions reached during 
              the discussion at the Board meeting on July 11. That list is shown 
              below, organized as follows: (1) repair and renovation (including 
              energy efficiency projects), (2) technology and equipment, and (3) 
              proposed Facility Master Plan projects. The District seeks Board 
              approval of the list as a basis for General Obligation Bond projects. 
              The cost of the projects total $246 million, of which $207 million 
              would be funded through a General Obligation Bond and $39 million 
              would be funded through local and State sources, in addition to 
              interest revenue generated from the investment of Bond funds. I. 
              REPAIR & RENOVATION $100 
              million ($90 million G.O. 
              Bond, $10 million State and local funding)  
              A. Repair 
                or replace roofingB. Remove hazardous materials
 C. Renovate or replace plumbing systems
 D. Renovate or replace storm drainage systems
 E. Repair or replace sanitary drainage systems
 F. Repair, replace or renovate underground hot water piping system
 G. Replace or upgrade fire alarm systems
 H. Replace or upgrade building fire sprinkler systems
 I. Renovate or upgrade restrooms
 J. Repair, renovate or construct elevators and lifts
 K. Install battery backup power for elevators
 L. Grade slopes to improve accessibility
 M. Repair or replace asphalt and concrete surfaces
 N. Replace or install campus signage to improve accessibility
 O. Interior and exterior painting and waterproofing
 P. Replace, repair, or renovate interior finishes
 Q. Repair or replace door hardware and locks
 R. Replace or repair landscape irrigation systems
 S. Erosion mitigation
 T. Energy Efficiency:
 
                 Replace 
                  or upgrade electrical systems Replace 
                  or install new lighting systems Repair, 
                  replace or install new heating, ventilation and air conditioning 
                  systems Repair 
                  or upgrade windowsInstall 
                  energy management systemsReplace 
                  or upgrade environmental controls
 U. Resurface 
                tennis courts *V. Resurface athletic fields *
 W. Renovate aquatic facilities *
 X. Renovate athletic facilities *
 * Not currently 
                proposed for General Obligation Bond proceeds II. TECHNOLOGY AND EQUIPMENT $40 million 
              (G.O. Bond)
  
              A. Replace 
                obsolete voice and data communications systemsB. Renovate, upgrade or install infrastructure for networks
 C. Upgrade or replace computer hardware, including network equipment
 D. Replace or upgrade software
 E. Replace analog systems with digital broadcast equipment and 
                related communications devices
 F. Upgrade or replace science lab equipment (e.g., imaging astronomy 
                cameras, Planetarium star projector, measuring scales, seismograph 
                stations, weather instruments, optic systems and timers, microscopes)
 G. Upgrade or replace workforce development, vocational, and occupational 
                lab equipment (e.g., aircraft scales, vacuum systems, fiber optic 
                kits, cutters/torches, motion graphics equipment and software, 
                X-ray systems, light curing units, patient beds, facial machines, 
                professional hair dryers, automotive lifts, and Law Enforcement, 
                Fire Safety and Emergency Medical Training units)
 H. Upgrade or replace audio visual equipment
 I. Upgrade or replace visual/performing arts equipment (e.g., 
                pianos, keyboards, music stands, cameras, projectors, enlargers, 
                developers, audio sound machines, editing machines, recorders)
 J. Replace or upgrade furniture and fixtures (e.g., desks, workstations, 
                chairs, tables, podiums, screens, lecterns, white boards, chalk 
                boards)
 III. 
              MASTER PLAN PROJECTS $106 million ($77 million G.O. Bond, $29 million 
              State and local funding)
 Cañada College
  
              1. Library/Learning 
                Resource Center (State Capital Outlay and General Obligation Bond)2. University Center (State Capital Outlay & General Obligation 
                Bond)
 3. Student Support Services Extension (General Obligation Bond)
 College 
              of San Mateo  
              1. Integrated 
                Science Center (State Capital Outlay and General Obligation Bond)2. Vocational Technology & Communications Center (State Capital 
                Outlay and General
 Obligation Bond)
 3. Regional Public Safety Center (local public safety agencies 
                and General Obligation Bond)
 4. Student Support Services Center (State Capital Outlay and General 
                Obligation Bond)
 Skyline 
              College 
              1. Occupational 
                & Work Force Development Center (General Obligation Bond)2. Student Support & Community Services Center (Student Union 
                Fee and General
 Obligation Bond)
 3. Childhood Development Center (State Capital Outlay)
 4. Pacific Heights campus redevelopment (local funds and General 
                Obligation Bond)
 5. Automotive Technology-Transmission Facility (General Obligation 
                Bond)
  Districtwide 
              1. Temporary 
                classroom, lab, office, restroom, and storage facilities during 
                reconstruction2. Other property acquisitions and improvements
 