CSM Aquatics Project

Underground water piping work at the traffic circle in front of Building 8 for pool heating retrofit. Scope includes work in B6 the pool mechanical room as well as trenching from the traffic circle to the front of the pool room. The traffic circle and adjacent sidewalks will be fenced off to protect pedestrians from construction. Walkways and ADA access will be blocked so please use an alternative route to the nearest entrance.

The area will be blocked starting 8 am June 21 and will be reopened before the beginning of Fall semester.

SCHEDULE

June 21st, 2017 - August 18th, 2017

7:00am-5:00pm