Skip to contentSkip to main navigationSkip to local navigation

Skyline - Exterior Lighting Upgrades

​The District is replacing existing exterior lighting throughout the Campus along pedestrian pathways, roadways, and buildings. This new lighting system, integrated with the existing Facilities Management System (FMS), will enable the District to manage the lighting system in a more efficient manner resulting in energy and operational savings, improved lighting levels, and improved safety and security. 

See attached map showing areas and time frames when construction will take place on Campus.  Please note some of the more difficult locations are planned to take place the following week; i.e. during Spring Break, 3/28 – 4/1.

We apologize for any inconvenience and we look forward to the improvements to our beautiful campus.


March 21st, 2016 - May 6th, 2016


​There will be an impact to pedestrian pathways, certain parking stalls for a limited time, and traffic patterns on a limited timeframe. We will do our best on minimizing the impact to our community.