Measure C Bond Project List
I. REPAIR & RENOVATION
A. Repair or replace roofing
B. Remove hazardous materials
C. Renovate or replace plumbing systems
D. Renovate or replace storm drainage systems
E. Repair or replace sanitary drainage systems
F. Repair, replace or renovate underground hot water piping system
G. Replace or upgrade fire alarm systems
H. Replace or upgrade building fire sprinkler systems
I. Renovate or upgrade restrooms
J. Repair, renovate or construct elevators and lifts
K. Install battery backup power for elevators
L. Grade slopes to improve accessibility
M. Repair or replace asphalt and concrete surfaces
N. Replace or install campus signage to improve accessibility
O. Interior and exterior painting and waterproofing
P. Replace, repair, or renovate interior finishes
Q. Repair or replace door hardware and locks
R. Replace or repair landscape irrigation systems
S. Erosion mitigation
T. Energy Efficiency:
- Replace or upgrade electrical systems
- Replace or install new lighting systems
- Repair, replace or install new heating, ventilation and air conditioning systems
- Repair or upgrade windows
- Install energy management systems
- Replace or upgrade environmental controls
U. Resurface tennis courts *
V. Resurface athletic fields *
W.Renovate aquatic facilities *
X. Renovate athletic facilities *
* Not currently proposed for General Obligation Bond proceeds
II. TECHNOLOGY AND EQUIPMENT
A. Replace obsolete voice and data communications systems
B. Renovate, upgrade or install infrastructure for networks
C. Upgrade or replace computer hardware, including network equipment
D. Replace or upgrade software
E. Replace analog systems with digital broadcast equipment and related communications
devices
F. Upgrade or replace science lab equipment (e.g., imaging astronomy cameras, Planetarium
star projector, measuring scales, seismograph stations, weather instruments, optic
systems and timers, microscopes)
G. Upgrade or replace workforce development, vocational, and occupational lab equipment
(e.g., aircraft scales, vacuum systems, fiber optic kits, cutters/torches, motion
graphics equipment and software, X-ray systems, light curing units, patient beds,
facial machines, professional hair dryers, automotive lifts, and Law Enforcement,
Fire Safety and Emergency Medical Training units)
H. Upgrade or replace audio visual equipment
I. Upgrade or replace visual/performing arts equipment (e.g., pianos, keyboards, music
stands, cameras, projectors, enlargers, developers, audio sound machines, editing
machines, recorders)
J. Replace or upgrade furniture and fixtures (e.g., desks, workstations, chairs, tables,
podiums, screens, lecterns, white boards, chalk boards)
III. MASTER PLAN PROJECTS
Cañada College
1. Library/Learning Resource Center (State Capital Outlay and General Obligation Bond)
2. University Center (State Capital Outlay & General Obligation Bond)
3. Student Support Services Extension (General Obligation Bond)
College of San Mateo
1. Integrated Science Center (State Capital Outlay and General Obligation Bond)
2. Vocational Technology & Communications Center (State Capital Outlay and General
Obligation Bond)
3. Regional Public Safety Center (local public safety agencies and General Obligation
Bond)
4. Student Support Services Center (State Capital Outlay and General Obligation Bond)
Skyline College
1. Occupational & Work Force Development Center (General Obligation Bond)
2. Student Support & Community Services Center (Student Union Fee and General
Obligation Bond)
3. Childhood Development Center (State Capital Outlay)
4. Pacific Heights campus redevelopment (local funds and General Obligation Bond)
5. Automotive Technology-Transmission Facility (General Obligation Bond)
Districtwide
1. Temporary classroom, lab, office, restroom, and storage facilities during reconstruction
2. Other property acquisitions and improvements