Cañada College Accessibility Ramps Installation

Construction Schedule: Completed December 2004

Funding Source: Measure C General Obligation Bond Funds

rr

Various ramps on campus are non-compliant with current ADA Accessibility code requirements which require that all buildings are accessible to students and staff, including those with disabilities. The project scope, to be completed in Fall 2004, includes site preparation, excavation, wall retainage, installation of concrete and rebar; asphalt paving, pavement striping and minor landscape and irrigation restoration.