Cañada College Building 22
Construction Schedule: Completed Summer 2003
Funding Source: Measure C General Obligation Bond Funds
Building 22 is a new building that was added to the campus pool of classrooms in Fall 2003. It provides two 1100 square foot classrooms, two 900 square foot classrooms, and several smaller teaching spaces. All classrooms are Smart Classrooms, equipped with the most current tools in teaching technology.