Skyline Upper Soccer Trench Drain Project

Skyline Upper Soccer Trench Drain   Project

Contact   Information:

Project Manager
 
Christine Tai
  Telephone: 650 378-7362
  E-Mail: taic@smccd.edu

 

Project Assistant
  None

Telephone: (phone number)
  E-Mail: PA Email Address

Architect /   Engineer
  Verde Design

General Contractor

Rodan Builders

Soccer field

Project Documents

Schedule:

      
  • Bidding: April, 2015
  •   
  • Construction: May/ June        2015
  •   
  • Completion: June 2015
            
           

Description:
  A trench drain will be installed   along the north side of the Skyline Upper Soccer field.

Benefits:
 
This project will divert   excess water runoff during storms to mitigate ponding on the field. The work   will preserve the playability and safety of the field and its surroundings.

Status:
  Construction