AREAS TO BE CLOSED DUE TO CONSTRUCTION (June 2nd – Mid August 2008; see this map for details):
- All of Parking Lot #1 will be closed to all vehicles and pedestrians (Both North and South Sections) BOTHMAN CONSTRUCTION WILL BE CLOSING OFF ALL OF PARKING LOT #1 BEGINNING SUNDAY, JUNE 1ST. Please do not park any vehicles in Parking Lot #1 beginning June 1st.
- Bus stop adjacent to Bldg. 1 to be relocated directly across the street to Bldg. 3
- Portion of Fire Lane Road in front of Bldg. 8 will be closed to replace the campus water shut-off valves
ADDITIONAL AREAS THAT WILL BE UNDER CONSTRUCTION (June 2nd – Mid August 2008):
- A portion of the Frisbee lawn and the West side of Bldg. 3 will be under renovation from June 2nd – Mid August
Parking Lot #2 will remain open for parking during this phase of construction.
The campus loop road will remain open around the campus, but (1) – (2) traffic lanes will remain open during construction from Bldg. 3 down the hill to Bldg. 1.
Bothman’s Construction trailer will be installed in the parking lot behind Bldg. 3 during this construction project. Staging of materials will be maintained at the small dirt lot below the Athletic Fields.
Access for emergency vehicles will be maintained at all times to all parts of the campus.
We greatly appreciate your patience and assistance as we launch this campus beautification project. |