Hi everybody – in an effort to do the most with the available space we have for our Ceramics Program, there will be some remodeling work in their areas on the 1st floor of Building 1 and on the loading dock they use.
The remodel project is scheduled to start December 18 through January 18.
You may see construction mobilization activities in and around the loading dock areas of Building 1 and Building 2. The four handicap parking spaces near the loading dock area of Building 2 will be temporarily lost and fenced off to provide Hensel Phelps Construction an area for their construction materials and equipment.
There should be no interruption to campus daily activities in Building 1. We appreciate your patience and understanding. As always, please exercise caution when walking through the areas on the backside of Building 1 and Building 2.
Questions, comments or concerns can be directed to Jack Herbert, Swinerton Construction Manager, at ext 7037, or herbertj@smccd.edu
Thanks -
Richard
Richard Inokuchi
Facilities Operations Manager
Skyline College 3300 College Drive San Bruno 94066
(o) 650-738-4166 (f) 650-738-4113 (c) 650-642-4974
inokuchir@smccd.edu
www.smccd.edu/accounts/smccd/departments/facilities/FPMOMain.shtml
P Please consider the environment before printing this e-mail