Hi everyone – before the rains are upon us again . . . we want to fix the some of our flooding issues in our parking lots. Storm drain improvements are needed to properly drain the accumulation of surface water. This will require some minor excavation in our parking lots so Bothman Construction can install new drainage systems. Lot K (vic the loading dock of Building 5) is our worst.
Beginning Monday, October 3 thru Friday, October 28 - - - five to six parking spaces in Lot K that are closest to Building 4 will be blocked off so Bothman Construction can maneuver their equipment and make their repairs.
I apologize for this temporary inconvenience. Take care -
Richard
Richard Inokuchi
Facilities Operations Manager
Skyline College 3300 College Drive San Bruno 94066
(o) 650-738-4166 (f) 650-738-4113 (c) 650-642-4974
inokuchir@smccd.edu
www.smccd.edu/accounts/smccd/departments/facilities/FPMOMain.shtml