Skip to content
Cañada Construction Notices Archive
- October 15, 2013 – Bus Stop Area Improvements
- October 2, 2013 – Buildings 3 and 8 Water Intrusion Repair
- October 1, 2013 – Handrails Installed Near Bus Stop
- September 30, 2013 – Buidling 18 Water Intrusion Repair
- September 25, 2013 – Charging Station Upgrade
- August 1, 2013 – Circle Road Repairs
- July 30, 2013 – Work on Farm Hill Road Entrance
- July 29, 2013 – Campuswide Signage Improvements Improvements
- July 15, 2013 – Bus Stop Improvements
- June 17, 2013 – Light Pole Repainting
- June 10, 2013 – Walkways around amphitheater blocked
- May 6, 2013 – Parking Stalls along east side of lot 5 blocked
- April 10, 2013 – Construction Work Throughout Campus
- January 7, 2013 – Trucks Coming and Going Near Tennis Courts
- January 6, 2012 – Construction Barricades in Buildng 5 Dining Room
- December 13, 2011 – Building 5 Dining Room Closed
- September 22, 2011 – Truck in Plaza Between B6 and B8
- September 15, 2011 – Third Floor Restrooms in Building 5 Closed
- August 11, 2011 – Parking Lots Closed
- July 29, 2011 – Underbrush Clearing in Olive Grove of Trees
- July 25, 2011 – Landscaping Between B2 and B8
- June 29, 2011 – No water in B1
- August 31, 2010 – All Campus Roads Closed (Canada Vista Access Available)- 9/4-5/2010
- August 31, 2010 – All Campus Roads Closed (Canada Vista Access Available)- 9/4-5/2010
- July 29, 2010 – Concrete Truck Near Building 5 - 7/30/2010
- July 8, 2010 – Trucks on Campus - 7/9/2010
- March 29, 2010 – No Access to Building 17 - 4/3-10/2010
- December 9, 2009 – Road Paving Near Cañada Vista - 12/10/2009
- October 16, 2009 – Tree Trimming Near Loop Road - 9/28-10/30/2009
- October 15, 2009 – Walkway between Lot 10 and B21 Unavailable - 10/16-23/2009
- September 28, 2009 – Woodland Maintenance at Loop Road - 9/28-10/2/2009
- September 22, 2009 – Redi-Wheels Bus Shelter Removal - 9/22-29/2009
- July 22, 2009 – Building 3 Pressure Wash - 7/17/2009
- July 22, 2009 – Secondary Gateway Closed - 7/28/2009
- July 7, 2009 – Cement Trucks on Loop Road - 7/9/2009
- June 11, 2009 – Fire Alarm Testing - 6/12/2009
- June 5, 2009 – Construction Crane on Loop Road - 6/10/2009
- May 19, 2009 – Loop Road Striping - 5/19-21/2009
- May 15, 2009 – No Power on Campus - 5/24 & 5/31/2009
- May 11, 2009 – No Power in Building 18 - 5/10/2009
- April 16, 2009 – Parking Lot 3 Closed Permanently - 4/20/2009
- April 15, 2009 – Parking Lot 6 Closed - 4/16 - 18/2009
- April 15, 2009 – SamTrans Changes- 4/15/2009
- April 6, 2009 – Parking Lot 3 Closed - 4/13/2009
- April 3, 2009 – Spring Break Construction - 4/6-10/2009
- March 3, 2009 – Sandblasting Near Arrival Zone - 3/7/2009
- February 11, 2009 – Power Outage at Building 18 - 2/14/2009
- December 16, 2008 – No Water Campuswide- 12/22 - 23/2008
- November 21, 2008 – Buidling 18 Elevator - 11/24/2008 - 11/28/2008
- November 13, 2008 – Traffic Disruptions at the Primary Gateway - 11/17/2008 - 1/6/2009
- November 7, 2008 – Fire Alarm Testing in Building 15 - 11/13/2008
- November 7, 2008 – Fire Alarm Testing in Buildings 16,17&18 - 11/10/2008
- October 22, 2008 – Power Shut Off in Building 9 - 10/26/2008
- October 21, 2008 – Crane on Frisbee Lawn - 10/28/2008
- September 29, 2008 – Loop Road Near Lot 7 and Lot 7 Closed - 10/6-12/19/2008
- September 16, 2008 – Loop Road Near Secondary Entrance Closed - 9/15-10/10/2008
- September 12, 2008 – Facilities Assessment on Campus - 9/15-17/2008
- September 10, 2008 – Phased Closure of Arrival Zone #5 - 9/15-10/24/2008
- September 10, 2008 – Parking Lot 6 Closed for Resurfacing - 9/11-18/2008
- September 2, 2008 – Construction Equipment on Raod East of Building 18 - 9/3-4/2008
- August 20, 2008 – Building 8 Closed - 8/25/2008-January 2009
- August 19, 2008 – Bookstore Mailbox Relocated - 8/19/2008
- August 11, 2008 – Partial Closure of Lot 2 - 8/8-22/2008
- July 31, 2008 – Large Trucks on Secondary Road - 8/5/2008
- July 31, 2008 – Water Shutdown in Many Buildings - 8/5/2008
- July 31, 2008 – Crews Working in Ceilings of Buildings 2, 22 and 9 - 8/4 -15, 2008
- July 25, 2008 – No Access to Second Floor of Building 17 - 7/28-8/13/2008
- July 15, 2008 – Movers in Buildings 8 & 9 - 7/28-30/2008
- July 9, 2008 – No Power in Buildings 16/17/18 - 7/11/2008Map Updated 7/14/2008
- June 24, 2008 – Construction and Road Closures Near Building 16 - 6/25/2008
- June 17, 2008 – Parking Lot Disruptions - 6/2 - 8/14/2008
- June 17, 2008 – Some walkways and the Campus Road Blocked - 6/2 - 8/14/2008
- June 13, 2008 – Dust, Noise & possible unpleasant odor from roofing of Buildings 16&18 - 6/17 -
27/2008
- June 13, 2008 – Construction Activity on Access Road near Building 16 - 6/16/2008
- June 13, 2008 – Road and Pedestrian Access Closures - 6/2 - 8/14/2008
- May 29, 2008 – Parking Lot Closures & Bus Stop relocation - 6/2 - 8/15/2008
- May 27, 2008 – Construction Equipment and Road Blockages near Building 16 - 5/30/2008
- May 23, 2008 – Construction Equipment and Road Blockages near Building 18 - 5/27/2008
- May 16, 2008 – Cranes West of Building 16 and East of Building 18; Access Roads Blocked - 5/20-28/2008
- May 8, 2008 – UPDATE - Concrete Trucks Entering Campus from Farm Hill Road; Road Barriers - 5/9/2008
- May 6, 2008– Concrete Trucks Entering Campus from Farm Hill Road; Road Barriers - 5/8/2008
- April 30, 2008– Ramp Near Building 17 Closed Temporarily - 5/2/2008
- April 24, 2008– Periodic Drop in Water Pressure and Water on Roads - 4/25/2008
- April 21, 2008– Concession Stand Construction - 4/21-8/19/2008
- April 3, 2008– Temporary Handicapped Parking Spaces in Lot 4 - 4/4-18/2008
- March 28, 2008– Heavy Equipment on Campus Road - 3/31-4/18/2008
- March 14, 2008– Gymnasium Being Painted - 3/15-21/2008
- February 5, 2008– Paving along Buildings 8, 13,16; B8 Inaccessible in PM - 2/5/2008
- January 31, 2008 – Buildings 16/18 Modernization New Fax/Phone Lines - 2/8/2008
- January 22, 2007 – Road Near Building 13 Closed to Pedestrian and Vehicle Traffic - 1/22-2/15/2007
- December 19 , 2007 – Buildings 16/18 Modernization
- November 8, 2007 – North Quad Water Feature Repair
- September 19, 2007 – Construction Fencing in Lot #7- 9/19/2007
- July 20, 2007 – Restricted Access to Building 18 - 7/23-24/2007
- July 18, 2007 – Borings along the Campus Road - 7/26/2007
- July 13, 2007 – Building 3 Room 117 Demolition - 7/17 - 7/20/2007
- June 29, 2007 – Parking Lot #2 Closed - 6/29 - 7/5/2007
- June 12, 2007 – North Quad Water Feature Beautification - 6/12 - 7/27/2007
- May 24, 2007 – Old Stairs Near Building 9 Removed - 5/28-6/17/2007
- March 29, 2007 – Men's Restroom in Building 5 Closed - 3/30 - 4/6/2007
- March 27, 2007 – Fire Alarm Testing in Building 9 - 3/28 & 30/2007
- February 8, 2007 – Roofing Work at New Library & Learning Resource Center - 2/8-28/2007
- December 12, 2006 – Entire Campus Power Shutdown 12/27-29/2006
- December 12, 2006 – Building 17 Closed - 12/8-11/2006
- November 15, 2006 – Intercampus Road Between Buildings 8 and 13 Partially Closed - 11/16/2006
- November 13, 2006 – Building 17 Ramp Closure Cancelled
- November 10, 2006 – Building 17 Modernization Begins - 11/14/2006, 1-6PM
- November 10, 2006 – Building 22 3D Animation Construction - 11/13/2006 - 1/15/2007
- October 24, 2006 – Building 13 Water Shutdown - 10/27/2006
- October 11, 2006 – Temporary closure of Building 17 - 10/11/2006 - 1/14/2007
- October 11, 2006 – Temporary closure of upper walkway in Quad outside of Bldg 13 - 10/19-11/3/2006
- September 7, 2006 – Roofing System Being Installed at Building 9 (the new LRC) - 9/7-28/2006
- August 16, 2006 – Landscape, Grading, Paving and Irrigation work at the Frisbee Lawn and Quadrangle
plaza.
- August 14, 2006 – Installation of traffic count monitoring equipment
- August 11, 2006 - Water Shutdown - Building 13 for new fire hydrant installation
- July 18, 2006 – Fountain and Frisbee Lawn Fenced Off July, 2006 - January, 2007
- May 31, 2006 – Building 18 Restroom Closure on June 1, 2006
- March 1, 2006 – Power Shutdown to Buildings 13, 16, 17, 18, 19, 20, 21, 22 from 10:30 PM on 03/03/06
until 2:00 AM on 03/04/06
- January 10, 2006 – Paint Touch Up in Buildings 3, 8 and 13 on 01/14/06
- December 14, 2005 – Holiday Heating, Lighting and Building Security Schedule from 12/23/05 to 01/03/06
- November 10, 2005 – Campus-Wide Power Outage on 11/11/05
- October 20, 2005– Campus Wide Power Outage on 10/30/05 and 11/11/05
- October 5, 2005 – Gas Shutdown to Campus and Water Shutdown to Building 13 on 10/08/05
- September 14, 2005 – Increased Traffic on Loop Road from Lot 6 to Farm Hill Blvd. on 09/15/05 and 09/16/05
- September 12, 2005– Temporary Closure of Building 3 North Staircase
- September 2, 2005 – Temporary Staircase at Building 18
- August 22, 2005 – Temporary Closure of Pathway between Buildings 22 & 18 from 08/23/05 to 08/24/05
- July 20, 2005 – Welding on 2nd Floor, Bldg 8
- June 30, 2005 – Brief Traffic Delays near Building 16 the week of July 5, 2005
- June 29, 2005 – Asbestos Abatement in Buildings 3, 8 and 13 on 07/02/05 and 07/03/05
- June 27, 2005 – Increased Loop Road Traffic on 07/28/05
- June 27, 2005– Temporary Closure of the Tennis Courts from 07/05/05 to 08/23/05
- June 17, 2005 – Building 8, East Entrance Closed from 06/20/05 to 06/24/05
- June 17, 2005 - Asbestos Removal Building 13 on 06/25/05 and 06/26/05
- June 17, 2005 - Asbestos Removal Building 3 on 06/18/05 and 06/19/05
- May 20, 2005 – Window Treatments, Viewing and Feedback Forms
- May 13, 2005 – No Vehicle Access, west side of Building 13 on 05/16/05 and 05/17/05
- May 12, 2005 – Window Treatment Survey! From 05/20/05 to 05/24/05
- May 12, 2005 – Partial Heat Shutdown to Buildings 5 and 6 from 05/16/05 to 05/27/05
- May 5, 2005 – Renovation of Building 8 Rooms 111 and 115 from May 6, 2005 to May 27, 2005
- May 5, 2005 – Fire Alarm Testing from 05/09/05 to 05/10/05
- April 22, 2005 – Road Closed to Vehicles on the west Side of Building 13 on 04/26/05
- April 6, 2005 – Baseball and Soccer Field Temporary Closure Beginning 04/11/05
- March 18, 2005 – Phased Heat Shutdown to Building 3 from 03/14/05 to 04/08/05
- March 18, 2005 – Phased, Interrupted Access to Buildings 13, 18, Quad and Parking Lot 1 from 03/21/05
to 07/29/05
- March 3, 2005 – Water Shutdown Restroom Closure Building 17 & 18 from 03/21/05-03/23/05
- March 3, 2005 – Asphalt Replacement near Buildings 5 & 8 from 03/21/05 through 03/25/05
- March 3, 2005 – Fire Alarm Testing from 03/21/05 through 03/25/05
- September 1, 2004 – Ramp Repairs and Plaza Improvements Fall 2004