Skyline College Project Summary
In 2001 the Facilities Planning & Operations Department of the San Mateo County Community
College District commissioned a Facilities Master Planning Process to assess the current condition of the physical environment, identify the repair/renovation
and new construction projects required to support the current and future instructional
needs of Skyline College. The 2001 Educational Facilities Master Plan is the culminating report that documents that master planning process. The first
phase of the capital improvement program (CIP1) directly addressed the most urgent
needs identified in the 2001 Educational Facilties Master Plan, in support of Skyline
College's mission.
Since then the District has reviewed and updated its master plan in 2006, 2011, 2015 and 2022.
For current information on how the Capital Improvement Construction Projects will impact the campus, click on the links below:
Project summaries are currently available for the following Skyline College Capital Improvement Construction Projects. Click on each project for more details:
Current Projects
SKY B2 Workforce & Economic Development Prosperity Center Modernization
SKY B3/7 Exhaust Fan and B7 HVAC Split Units Replacement (Pending)
Completed Projects
- SKY College Ridge - Faculty & Staff Housing
- SKY B19 Swing Space
- SKY B3 Portables Replacement
- CSM and Skyline Roof Replacement Project
- District Wide NoX Boiler Burner Replacment Project
- Skyline College Electrical Infrastructure Replacement/Load Center 2 Project
- Skyline CIP2 Design-Build Project
- Buildings 1 & 2 - Hazardous Substances Abatement
- Building 8 - Modernization & Seismic
- Building 2 - Phase II (CALT)
- Utility Infrastructure Upgrades
- Building 3 - Modernization & Seismic
- Athletic Facilities - Upgrades & Renovation
- Building 6/7A - Student Union/Science Wing
- Summer 2003 - Paving Improvements
- Building 7 - Allied Health, Modernization & Seismic
- Districtwide Hazardous Materials Abatement
- Facilities Maintence Center
- Corporation Yard
- Building 1 Ceramics Lab Modernization
- CIP1 ACAMS Add-On Project
- Skyline Upper Soccer Trench Drain Project
- SKY Lot L Expansion
- SKY B19 Swing
- SKY B14 Renovations
- SKY B12N Environmental Science
- SKY Fitness Parkland & Accessible Route to College Ridge
- SKY STEM Center